Saturday, May 31, 2008

Does Fed Ex Hold Package For Vacation



This weekend, the electrician is there. Finally, the work resumed. We now hope that everything will end soon. After its passage, there will be more than:
- Some tiles tiles to ask. (2 hours)
- Finish plumbing (sinks, toilets, cumulus taps)
- Make plaster.
It also requires that the consuel (National Committee for Security of electricity users) valid electrical installation. According to the electrician, it can sometimes be very fast, sometimes long (1 month) ... We hope to
onc has always see the house before the summer break, as promised by Mas Toulousain on this blog (comments left on the message of May 13).

Yesterday, we asked the pickets fence between our yard and the neighbors. It takes until they can do more ...

Monday, May 26, 2008

Make A Bluetooth Snes Controller

Foundations Closing


Yesterday we poured concrete for the foundations of closing side streets. This step does not involve the mas Toulouse (such as connections). It remains for us to ask friends to book a weekend to lay the blocks ...

Sunday, May 25, 2008

Lighting Eml Series E100 Manual

The dozer is done, the plaster comes



Friday, the plaster has been delivered. We assume coaters will happen. We expect this step with hate. We brought the digger yesterday and connections are made (finally sheaths as EDF and France Telecom have come cable). We also ask some gravel to create access to the garage. This leaves more than to finish the house: At Mas Toulouse play.

Wednesday, May 21, 2008

Lobster Boat Building

Meeting site with Le Mas Toulousain



We had a site meeting this morning, just to visit. For bright spots that we find there, they are going back as far as possible (they are limited by the length of cable). Otherwise we could see the tiles, it is well posed. We now await the arrival of the electrician who should be here next week. Then he will plaster ... Then, it will still be a little patient because the tiler doir return for a dozen tiles missing and the plumber to ask sinks and faucets. So according to Le Mas Toulouse, we have for another month.

Saturday, May 17, 2008

Bathtub Drain Clogged With Sand

expected a site meeting

We went to the site yesterday, we realized that some mistakes were made: the bright spots of residence are located halfway up the wall (about 1.80) is very low, impractical and unsightly. We will call on Monday to take mas Toulouse visit the site ... And it will allow us to visit.

Tuesday, May 13, 2008

Female Paddling Discipline

Nothing new

We went to the site today and found that nothing has changed since a week. Furthermore we phoned the driver works for the promised samples of plaster for at least a month. We also asked if we could have a key to the house to begin within a month painting and floors of rooms. We may be tomorrow but for the plaster keys ... Mas Toulousain refuses. The commercial drivers of work had yet thought it could be possible ...

Wednesday, May 7, 2008

Does Fedex Hold Package For People On Vacation

The tiling is completed

Last Sunday, the tile was in the house! He finished the work and everything seems perfectly done (We were unable to verify, not having the keys ...). Today we await the return of the plumber he finishes his part (faucets, sinks, wc ...). We also expect samples of plaster to select it. Mas Toulousain we must pass them.